Dave Vaclavik
Dave Vaclavik
absorb approved authority based board connection fee felt francis ought prepared similarity virtually
The board felt that with the two connections being virtually identical, they ought to have the same price. They approved the fee of $28,000 based on the similarity of the connection in Francis Creek. The authority is prepared to absorb the difference.