Gary Garnant

Gary Garnant
decided power requiring talk
There's a lot of talk about even requiring utilities now to diversify. But we've decided long ago to diversify our power resources.
central energy looking number potential throughout wind
That's being done throughout central Washington. There are a number of utilities that are looking at the potential for wind power.
average behind factor farm good hills hour miles per power site speeds wind
That was a good site for that wind farm on the hills behind Kennewick. They get average wind speeds of 14 to 16 miles per hour consistently so they have a good power factor for those wind turbines.