Marilyn Coker

Marilyn Coker
add electrical handicap interior needs outside plumbing work
There's a lot of interior work to be done. The electrical and plumbing needs to be done. Ceilings need to be put in place, the sprinkler system, and on the outside we have to add handicap access.
dream saved
My dream is to see it used. That's what we saved it for.
drawings involved people problems project ran top work
We ran into problems getting the drawings and permitting together. A lot of the people involved with the project had so much work on their hands, on top of this.