Mike Tudor

Mike Tudor
canadian coast crude delivered gulf oil time
This is the first time that Canadian crude oil has been delivered to a Gulf Coast pipeline.
authority excited
I've never been more excited about anything I've done on the authority.
bright designed future higher line looks originally rate run
We originally designed it to do 50,000 (barrels a day). We've managed to run the line rate higher than 66,000, so the future looks pretty bright for this right now.